Wastewater treatment plant KTO-50.K20.Ц at the oil field site (VIDEO!)
In 2020 at the landfill of Messoyakhskoye oilfield (PJSC Gazprom neft) a complex for thermal treatment of industrial waste water KTO-50.K20.Ц was commissioned. Contaminated wastewater from municipal solid waste treatment and wastewater from the disinfection gates and container steaming facilities of is directed to utilization with the help of cyclone incinerator, which design proved itself the most effective for such tasks.
Uninterrupted operation of the complex at extremely low temperatures is ensured by design and the possibility of switching to fully automatic mode of operation. KTO-50.K20.Ц was delivered to the site ready-to-use. The check assembly and tests were carried out at the manufacturer site — LLC Sosnovoborsky Machine-Building Plant.